Loading...
21-08 - Building Permit FeesTHE CORPORATION OF THE TOWNSHIP OF MALAHIDE BY-LAW NO. 21-08 Being a By-law to amend Schedule "B" to By-law No. 07-09 insofar as it prescribes fees for various classes of permits with respect to the construction, demolition and change of use of buildings. WHEREAS Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23, as amended, empowers Council to pass certain by-laws respecting construction, demolition and change of use permits and inspections; AND WHEREAS the Council of The Corporation of the Township of Malahide enacted By-law No. 07-09 respecting the construction, demolition, and change of use permits and inspections for the Township of Malahide; AND WHEREAS the Council of The Corporation of the Township of Malahide deems it expedient to amend Schedule "B" to By-law No. 07-09 insofar as it prescribes fees for various classes of permits with respect to the construction, demolition, and change of use of buildings; NOW THEREFORE the Council of The Corporation of the Township of Malahide HEREBY ENACTS AS FOLLOWS: THAT Schedule "B" to By-law No. 07-09 insofar as it prescribes fees for various classes of permits with respect to the construction, demolition, and change of use of buildings, be and it is hereby replaced in its entirety with the Schedule "B" attached hereto. 2. THAT By-law No. 13-53, By-law No. 17-83, and By-law No. 20-10 be and the same are hereby repealed in their entirety. 3. Any other by-law or provisions in other by-law found to be inconsistent with this By-law are hereby deemed to be repealed. 4. THAT this By-law shall come into force and take effect on the final passing thereof. READ a FIRST and SECOND time this 7th day of January, 2021. READ a IRD time and FINALLY PASSED this 7th day of January, 2021. 7 `PGlayor, D. Mennill Clerk, M. Casavecchia-Somers V"ul New Residences (detached or multiple) and additions up to 5,000 square feet New residences (detached or multiple) and additions exceeding 5, 001 square feet Attached garage on new home Industrial, Institutional and Commercial buildings up to 10,000 square feet Industrial, Institutional and Commercial buildings exceeding 10,001 square feet Interior or Exterior renovations, including all other classes of permits not stated SCHEDULE 'B' TO BY-LAW NO. 21-08 RESPECTING PERMIT FEES Flat fee of $150.00 + $.92/sq. ft. Flat fee of $150.00 + $.92/sq. ft. for the first 5,000 sq. ft. + $.82 for each additional sq. ft. $0.44/sq. ft. Flat fee of $150.00 + $0.92/sq. ft. Flat fee of $150.00 + $0.92/sq. ft. for the first 10,000 sq. ft. + $0.82 for each additional sq. ft. Flat fee of $150.00 for up to $1,000.00 construction value and then $10.45 for each additional $1,000.00 in construction value 2020 Flat fee of $150.00 + $.92/sq. ft. Flat fee of $150.00 + $.92/sq. ft. for the first 5,000 sq. ft. + $.82 for each additional sq. ft. $0.44/sq. ft. Flat fee of $150.00 + $0.921sq. ft. Flat fee of $150.00 + $0.92/sq. ft. for the first 10,000 sq. ft. + $0.82 for each additional sq. ft. Flat fee of $150.00 for up to $1,000.00 construction value and then $10.45 for each additional $1,000.00 in construction value 2021 Flat fee of $150.00 + $.92/sq. ft. Flat fee of $150.00 + $.92/sq. ft. for the first 5,000 sq. ft. + $.82 for each additional sq. ft. $0.44/sq. ft. Flat fee of $150.00 + $0.92/sq. ft. Flat fee of $150.00 + $0.92/sq. ft. for the first 10,000 sq. ft. + $0.82 for each additional sq. ft. Flat fee of $150.00 for up to $1,000.00 construction value and then $10.45 for each additional $1,000.00 in construction value 2022 Flat fee of $150.00 + $.92/sq. ft. Flat fee of $150.00 + $.92/sq. ft. for the first 5,000 sq. ft. + $.82 for each additional sq. ft. $0.44/sq. ft. Flat fee of $150.00 + $0.92/sq. ft. Flat fee of $150.00 + $0.92/sq. ft. for the first 10,000 sq. ft. + $0.82 for each additional sq. ft. Flat fee of $150.00 for up to $1,000.00 construction value and then $10.45 for each additional $1,000.00 in construction value a ITEM Decks, ramps and wood burning stoves Demolition, residential and non-residential Swimming Pool Plumbing permit (plumbing fee for a new building is included in the above noted building fee) Signs Change of Use Occupancy Permit before 24 months of date of the building permit issuance Occupancy Permit after 24 months after date of building permit issuance Farm Buildings (low human occupancy as defined in the O.B.C.) for up to 10,000 square feet Farm Buildings (low human occupancy as defined in the O.B.C.) exceeding 10,001 square feet Accessory Buildings 2019 $294.00 $186.00 $294.00 Flat fee $150.00 + $10.45 per fixture $186.00 Included in above fees $294.00 Flat fee $150.00 + $.43/sq. ft. Flat fee of $150.00 + $.43/sq. ft. for the first 10,000 sq. ft.+ $.37 for each additional sq. ft. Flat fee $150.00 + $.43/sq. ft. 2020 $294.00 $186.00 $294.00 Flat fee $150.00 + $10.45 per fixture $186.00 Included in above fees $294.00 Flat fee $150.00 + $.43/sq. ft. Flat fee of $150.00 + $.43/sq. ft. for the first 10,000 sq. ft.+ $.37 for each additional sq. ft. Flat fee $150.00 + $.43/sq. ft. 2021 $294.00 $186.00 $294.00 Flat fee $150.00 + $10.45 per fixture Included in above fees $294.00 Flat fee $150.00 + $.43/sq. ft. Flat fee of $150.00 + $.43/sq. ft. for the first 10,000 sq. ft.+ $.37 for each additional sq. ft. Flat fee $150.00 + $.43/sq. ft. 2022 $294.00 $186.00 $294.00 Flat fee $150.00 + $10.45 per fixture $186.00 $186.00 Included in above fees $294.00 Flat fee $150.00 + $.43/sq. ft. Flat fee of $150.00 + $.43/sq. ft. for the first 10,000 sq. ft.+ $.37 for each additional sq. ft. Flat fee $150.00 + $.43/sq. ft. 0 ITEM Manure Tanks, Grain Bins, Silos, Bunker Silos Sewage System Building Permit - Small Systems (New or Replacement Construction) Class 1,2,3,4 & 5 Serving Buildings: -with combined Occupant Loads <150 persons -with <5 bedrooms, - <6000 sq. ft., <45 FU's (res. buildings) - Tot. Daily Design Sanitary Sewage Flow <3000Uday Flat fee of $150.00 for up to $1,000.00 construction value and then $10.45 for each additional $1,000.00 in construction value $620.00 2020 Flat fee of $150.00 for up to $1,000.00 construction value and then $10.45 for each additional $1,000.00 in construction value $620.00 Flat fee of $150.00 for up to $1,000.00 construction value and then $10.45 for each additional $1,000.00 in construction value $620.00 4130r � Flat fee of $150.00 for up to $1,000.00 construction value and then $10.45 for each additional $1,000.00 in construction value $620.00